Submitted by Paddy Harris on Tue, 2014-11-04 12:53
04th November 2014
Petrobras is awaiting approval from the Brazilian Institute of Environment and Renewable Natural Resources (IBAMA) to begin a major 4D seismic project in the Santos Basin
Submitted by Paddy Harris on Mon, 2014-11-03 15:45
03rd November 2014
Petrobras and PPSA (Pré-Sal Petróleo S.A.) signed a Production Individualsation Agreement (PIA) for the Tartaruga Mestiça field, in the southern part of the Campos Basin on Friday
Submitted by Paddy Harris on Thu, 2014-10-30 09:40
30th October 2014
The P-66 platform’s first modules, built at the Tomé Ferrostaal Consortium’s Module Plant located at the Port of Maceió, Alagoas, are now ready and loaded on the São Tomé barge
Submitted by Paddy Harris on Wed, 2014-10-29 11:36
29th October 2014
Kleven's Myklebust Verft in Gursken, Norway, has signed a contract for modification of the Aker Wayfarer vessel to become a deepwater subsea equipment support vessel (SESV)
Submitted by Paddy Harris on Mon, 2014-10-27 14:43
27th October 2014
The Petrobras-led Libra consortium has said that the first extension well in the Libra area, known as 3-BRSA-1255-RJS (3-RJS-731), has proven the discovery of high-quality oil in the northwest portion of the structure
Submitted by Paddy Harris on Fri, 2014-10-24 14:42
24th October 2014
Petrobras has discovery a hydrocarbon accumulation in deep waters of the Espírito Santo Basin sub-salt by drilling well 4-BRSA-1265-ESS (ANP nomenclature) /4-GLF-42-ESS (Petrobras nomenclature), known as Lontra, at a water depth of 1,319 metres
Submitted by Paddy Harris on Mon, 2014-10-20 17:19
20th October 2014
Ocean Rig has been awarded extensions of the drilling contracts for its two ultra-deepwater drillships, the Ocean Rig Corcovado and the Ocean Rig Mykonos, by Petróleo Brasileiro S.A. (Petrobras) for drilling offshore Brazil
Submitted by Paddy Harris on Thu, 2014-10-16 11:29
16th October 2014
Petrobras’ consolidated oil and gas production in Brazil and abroad reached 2.781 million barrels of oil equivalent per day (boed) in September, up 0.8 per cent on the August figure of 2.759 million boed
Submitted by Paddy Harris on Wed, 2014-10-15 13:54
15th October 2014
Alcatraz Interlocks B.V (a Netherlands-based manufacturer) has been awarded a contract to provide valve solutions for processing units on the P-76 FPSO (floating production, storage and offloading) being constructed and upgraded by Technip-Techint for Petrobras
Submitted by Paddy Harris on Wed, 2014-10-15 08:26
15th October 2014
Petrobras’ platform Cidade de Mangaratiba went into operation yesterday in the Santos Basin pre-salt area of Iracema Sul, in Lula field, located on block BM-S-11